How long does it take to build a website?

How long a business website, an online store, or a rebuild of a ranking site takes to build, what each week goes on, and what usually causes delays.

GuidePublished 3 min readBy Muhammad Idrees

A typical small business website takes three to six weeks to build, from agreeing what it needs to do to the day it goes live. A rebuild of a site that already ranks on Google takes four to eight weeks, because the old site has to be mapped before anything new is built. Online stores and anything with logins or bookings take longer again. The build itself is rarely the slow part. Waiting usually is.

Typical timelines

ProjectTypical time
Business website, new or rebuiltthree to six weeks
Rebuild of a site that ranks on Google, keeping its rankingsFour to eight weeks
WooCommerce or large catalogue migrationLonger, scoped after a crawl shows how many product URLs exist
Online store, portal, or booking systemScoped per project, after the features and integrations are agreed

Where the weeks go on a business website

Most of my builds move through four stages, and you see working pages throughout:

  1. Agree what the site has to do. Who it is for, what a visitor should do on it, and which pages that needs. This is short, but every later week depends on it.
  2. Plan the pages. The structure of each kind of page and how it behaves on a phone, before any detailed design or build.
  3. Build and test. The site is built on a private address you can open at any time, so you review real pages rather than pictures of them.
  4. Launch and hand over. The domain is connected, search basics are checked on the live site, and you get written notes on how it works.

Why rebuilding a ranking site takes longer

If your current site brings in visitors from Google, the first week goes on a crawl of every address on it and a redirect map that sends each old address to its new home. Then come the build, a dry run of every redirect, the launch, and checks at 48 hours, two weeks, and six weeks afterwards. Skipping the first week is what makes rebuilds lose traffic. The redesign checklist covers each step.

What causes delays

The usual causes:

  1. Content. Text and photos that arrive late hold up everything after them, and are one of the most common reasons a launch date slips.
  2. Decisions. A question that waits a week for a meeting adds a week to the project.
  3. Scope that grows. "Can it also do this?" is a fair question, but each yes moves the date unless something else comes out.
  4. Access. Logins for the domain, the old hosting, payment providers, or other systems that nobody can find.
  5. Third parties. Payment provider approval, app store review, or a supplier who has to change something on their side.

How to get your site live sooner

  • Write or gather the text and photos before the build starts, even rough versions.
  • Name one person who can make decisions, and agree how quickly they will reply.
  • Find the logins for your domain and any current hosting at the start, not the end.
  • Launch with what you need, and add the extras in a second round once the site is live.

Can it be done faster?

Sometimes. A small site with all its content ready can go live sooner than the typical range. What should not be squeezed is testing on phones, the search basics, and, for a site that already ranks, the redirect work. A site launched a week early that loses its Google traffic costs far more than the week saved.

Starting a project

If you have a date in mind, include it when you tell me about the project, and I will say whether it is realistic and what it would take. I reply within one business day. For prices, see the guide to what a small business website costs.

Where to go next

Questions

How long does it take to build a small business website?
Usually three to six weeks from agreeing what it needs to do to launch. A rebuild of a site that already ranks on Google takes four to eight weeks, because the old site is mapped first.
What delays a website project?
Mostly waiting: text and photos that arrive late, decisions held for meetings, scope added mid-build, and missing logins for the domain or old hosting.
Can a website be built in a week?
A very small site with all its content ready can go live quickly. Phone testing, search basics, and, for a site that ranks, redirect work should not be cut to save time.